|
start:
after being in storage since the late 80s this old friend finally gets
its turn. engine is test fitted. Some old accident damage is fixed
properly.
|
 |
 |
 |
 |
sanding:
the 6 plus layers of paint are removed, took forever to get it down
to the original sheetmetal. |
 |
 |
 |
 |
|
more
sanding:
more paint removed, and some use of plastic was used to finish the contours.
|
 |
 |
 |
 |
|
final
bodywork/prep:
panels are back on for fitment checks, car is then prepped for primer,
taped, and masked.
|
 |
 |
 |
 |
|
priming
parts and chassis:
chassis is primed, and some glazing putty is used to fill imperfections
in bodywork, paint. chassis # and door #'s
|
 |
 |
 |
 |
more on priming
door cavities, and preparing the separate panels for final paint |
 |
 |
 |
 |
panels:
parts are readied for final paint, cleaned with degreaser, tacked
off, and shot with the Sikkens wet on wet sealer |
 |
 |
 |
 |
paint:
after a few minutes the guns are changed and final color is shot.
Ruby Red is sharp |
 |
 |
 |
 |
paintwork/and buff:
couple more shots of final paint, and the buffing process |
 |
 |
 |
 |